We were commissioned to develop and install two traveling dock cranes with a smart power management system at TMS in Werkendam.
This involves reducing the power consumption and recovering energy that can be used for other movements.
In addition to the PMS, we also took care of the electrical installation of the dock crane and drive gear.
The control and automation is also definitely covered for the operation which is possible from the control cabin or through a portable remote control.
Contact us, and we will help you.